RFP: IFAC Expert Services Grant Program – Local Bridges
The Local Highway Technical Assistance Council (LHTAC) is seeking proposals from qualified consulting firms to provide engineering, planning, and economic advisory services for stand-alone feasibility studies across seven (7) critical local bridges in Idaho. Selected consultants will deliver preliminary concept/TS&L reports, lifecycle maintenance schedules, environmental scans, and data collection worksheets to support LHTAC’s Cost-Benefit Analysis modeling. Contracts may be awarded for 1 to 7 bridges.
- Deadline for Questions: November 18, 2026
- Proposal Deadline: November 20, 2026, at 4:00 p.m. MST
- Request for Proposal
- Application reference file
- Submission Details: Maximum 6 pages (single PDF) emailed to , CC:
- Contact: Ken Kanownik | | (208) 344-0565
Frequently Asked Questions
| Question | Answer |
| We would like to respectfully request that LHTAC consider extending the response deadline for this RFP. | The due date will remain as announced in the RFP. |
| We’d like to confirm that working on this phase of these projects would not preclude any team members from working on future phases for either design or construction of the bridges. | LHTAC is unaware of any restrictions related to future phases. This cannot guarantee a future funding source for any of the bridges does not have such restrictions. |
| Can you clarify the scope of the RFP? The RFP and the provided application do not match. | Please refer only to the RFP for the scope. The attached grant application was to provide context to the entire project. Consider the feasibility portion of the project Phase 1 and the Financing and Infrastructure Bank Study portion Phase 2 which LHTAC will have a separate RFP for. |
| Can you clarify the scope of the RFP? The RFP and the provided application do not match. | Please refer only to the RFP for the scope. The attached grant application was to provide context to the entire project. Consider the feasibility portion of the project Phase 1 and the Financing and Infrastructure Bank Study portion Phase 2 which LHTAC will have a separate RFP for. |
| What is LHTAC’s plan if Geotech or Hydraulics is identified as a risk for any of the bridges during the study? | Should any type of risk outside the intended scope arise during the study LHTAC is prepared to address through allowable methods of contracting under the regulations applicable to the funding. |